Eagle Creek Bluff Clubhome Association RESIDENTS!

10/13/25 Project update:

Roof replacements on all buildings have been completed. All remaining materials, bathrooms and equipment have been called in for pick up.

10/9/25 Project update:

Roof replacements on buildings 1-6, 8, 9, 10, 11, 16, 17, 18, 19, 21, 22, 23 and 24 are now complete! We are currently working on buildings 7 and 15 and expect to wrap those up by the end of the day. Tomorrow we will move onto buildings 13 and 14 and Sat. we will start building 12, weather permitting. If all goes as planned we should wrap up with all buildings by the end of day Sat. We will remove equipment, materials, etc. next week.

10/6/25 Project update:

Roof replacements on buildings 1-6, 10, 11, 16, 17, 18 and 21 are now complete! We are currently working on buildings 23 and 24 and expect to wrap those up by the end of the day. In addition, we will start building 22 today. Tomorrow we will move onto buildings 19 and 9, weather permitting. If all goes as planned we should wrap up by the end of the week.

10/3/25 Project update:

Roof replacements on buildings 1-6, 16 and 17 are now complete! We are currently working on buildings 18 and 10 and expect to wrap those up by the end of the day. We will then move onto buildings 11 and 21 tomorrow and buildings 24 and 22 on Mon. (weather permitting).

10/2/25 Project update:

Roof replacements on buildings 1-6 are now complete! We are currently working on buildings 16 and 17. We will then move onto buildings 18 and 10 tomorrow. We will plan to work on Sat. as well and will likely start buildings 11 and 21 (weather permitting).

10/1/25 Project update:

We are completed with roof replacements on buildings 1-4 and are currently working on buildings 5 and 6. We will then move onto buildings 16 and 17.

9/30/25 Project update:

We’re working through the first few buildings and are completed with roof replacements on buildings 1 and 2 and are currently working on buildings 3 and 4. We will then move onto buildings 5 and 6 tomorrow.

What to expect:

We expect each building to take approx. 1-2 days to complete. We will have 3 crews working onsite and each on different buildings. We believe we will wrap up with all roof replacements in 2-3 weeks, weather permitting.

There will be disruptions and required accommodations to be made by residents. We appreciate your patience throughout the project and your understanding as we work through repairs.

As with any large construction project, some issues are anticipated. Please report them to us as soon as possible so we can address them accordingly.

Here is the What To Expect information laid out in a singular document for print or convenience: WHAT TO EXPECT  


Site Map + schedule:

You can download the map HERE

 

Vehicles * VERY IMPORTANT *

Have your vehicles off the driveway and moved out and away from your garage and building by 7:00 AM on the day(s) listed above and until your building has been completed to prevent damage to vehicles.


Suggestions to Ensure a Problem Free Roof

  • Remove patio furniture, grill and property from decks/patios as well as fragile items from walls, as these may incur damage during work. Contractor is NOT liable for such damages.

  • Please remove pet waste from your yard before the project starts to avoid messes on the roof and sidewalks, etc. as a result.

  • While we are working on your home, please close your window coverings during the day. This will help avoid any accidental embarrassments as the workers go up and down ladders to access the roof.


Landscaping

If there are any special or delicate plant or shrubs, please notify us of them before the job starts and we will protect them as best as possible.


Clean Up

One of the most important aspects of a project is keeping the area clean during the job. Here is how we strive to do this every day...

  • Clean your site during the day and at the end of the day.

  • Clean your lawn and site with our magnetic “nail-finder” to reduce chance of any nails being left in your lawn.

  • Keep our tools and materials neatly organized and out of the way.


Conditions beyond our control

Please be aware that despite our best efforts the following may occur during improvement projects, and are not the responsibility of the contractor:

  • Existing structural problems: Such as loose or cracked plaster and drywall, sagging rafters, nail-pops, bowed walls, previously rotted or damaged materials, etc.

  • Scheduling difficulties: We do our best to stay on schedule, but mother nature and other emergencies can lead to delays. We will do our best to limit delays.


Satellite Dish notice

Homeowners who have satellite dishes will be without service during the re-roofing of your building. Capital Construction will reset the dish to the best of their ability, however if you experience issues please notify your service provider to schedule a service call for recalibration. Here is the offical Satellite Dish Notice.

If you DO NOT want your satellite dish re-installed once the roof replacement is completed, please contact Josie Flicek before the start of your building by emailing josie.f@capitalmn.com so it can be properly disposed of.


Questions

Please do not hesitate to contact Stronghouse Solutions with any questions or concerns via the website form on this page, or by contacting your account manager, Josie Flicek, at 952.222.4004 or at josie.f@capitalmn.com. Please leave your address, name, email and phone number when you contact us. Thank you!